Carpentries are up halfway..by end of this week, everything will be done except for my kitchen glass sliding door & the tempered glass backing for my kitchen stove area :) Some pics taken by Chris last evening. I tink by next tueday, everything will be complete. Then we gota chk for defects b4 handing over the last payment..
Shoerack & featurewall for household shelter. Halfway done, still got another mirror.
Shoerack sort of sticking out. Cos i dun wan my featurewall to be so thick if all do the same width.
Dats where my hob & hood will be.
My $160 sink. So sad i cannt have double sink.
My MBR toilet...dat thing is my vanity cabinet.
My future daughter's wardrobe. The lobangs there are glass panels but haven arrive yet.
My MBR wardrobe. The lobangs there are also glass panels but haven done yet.